Digging the trench from the back entrance along the side of the house up to the front entrance (total distance about 100 ft). Storm Drain Installation (4in. PVC). To Install New Storm Drain Line connection to existing Storm Drain in the front side.
Trench catch basin install. View of Side of the house after work done. 4 in. PVC Clean out Installed for the cleaning purpose.
This house got Basement Flooding from the city sewer.
After a detailed Video Camera Inspection we have decided to install a Back Water Valve Outside.
We received the permit from the city and started the next project:
Our customers get back from the city $1250 as a rebate for BWV installation.